Table 2 Calibration of three scenario (S1, S2, S3)

Scenario 1 Scenario 2 Scenario 3
Qs 1,840,000+91,378.62P
Qs’ 1,855,534.37+91,378.62P 1,861,930.87+91,378.62P 1,871,982.51+91,378.62P
△Q 15,534.37 21,930.87 31,982.51
△PS 78,200.02 110,400 161,000
△GS –393,640.84 –557,263.41 –816,193.88
△TS –315,440.82 –446,863.41 –655,193.88
Source: own illustration <Appendix Figure 2>.
Note: PS, Producer Surplus; GS, Government Surplus; TS, Total Surplus.