P04 | A mistake in the project schedule estimation |
P05 | A mistake in the project cost estimation |
P07 | A mistake in the project size estimation not considering the project budget |
D04 | Design drawings that are different from project site conditions |
D07 | Improper cost estimates |
D15 | Omission & errors in the BOQ |
B01 | Improper criteria for pre-qualification & eligibility to bid |
B02 | Inappropriate method to select a preferred bidder |
B04 | Period of construction time not considering the local conditions |
B05 | An incorrect budget estimate published at a bid announcement |