Table 12 Top 10 risk factors

Var.code
P04 A mistake in the project schedule estimation
P05 A mistake in the project cost estimation
P07 A mistake in the project size estimation not considering the project budget
D04 Design drawings that are different from project site conditions
D07 Improper cost estimates
D15 Omission & errors in the BOQ
B01 Improper criteria for pre-qualification & eligibility to bid
B02 Inappropriate method to select a preferred bidder
B04 Period of construction time not considering the local conditions
B05 An incorrect budget estimate published at a bid announcement